The SCA campus is conveniently located on 36 acres near a major highway intersection in southeastern Lee's Summit, Missouri. Facilities include an elementary building completed in 2000, a secondary building completed in 2006 that houses administrative offices, secondary students, and a preschool wing, and the Goppert Classroom Wing addition to the secondary building completed in 2020.

Directions to SCA

291 From 50 Highway:

Travel south on 291 South to Persels Road. Take a right onto Persels. Southwest Jefferson will be the second left turn. The SCA campus is located on the west side of the road.

From 291 Highway:

If you are traveling north on 291 South to Persels Road, take a left onto Persels. Southwest Jefferson will be the second left turn. The SCA campus is located on the west side of the road. To enter into the Early Education/Secondary/Administration building, please use the fourth entrance to SCA on the right. For the Elementary (K-6th grades), please use the first entrance on the right. Visitor parking is located in front of both buildings.

Elementary Facility

The elementary school is located at 1450 SW Jefferson in Lee’s Summit. The 55,000-square-foot school building, four modular buildings, two playgrounds, a soccer field and a baseball field.

In the fall of 1999, the doors of the first phase of this facility were opened to 331 students. Phase I included ten classrooms, a multipurpose gymnasium, and administrative space. The second phase was completed for the start of the next school year adding 14 more classrooms, a library and a commons.

Secondary Facility

The secondary school is located at 1500 SW Jefferson in Lee's Summit. The 46,000-square-foot first phase of the new junior/senior high school facility was completed in 2006 and students moved in January 2007. Located next to the elementary building, this facility is designed to accommodate our fast growing student body. In 2016 SCA purchased the lot on the west side of Jefferson adding an additional acre to the campus.

The facility has classroom space, two fully-equipped science labs, a multipurpose room, a state-of-the-art media center, administrative offices, and a preschool wing.

In January of 2020, the Goppert Classroom Wing was completed and added an additional 11,000 square feet to the secondary building. This wing includes nine interactive classrooms, a nurse's office, and additional restrooms.

Fieldhouse & Activity Center

The Fieldhouse and Activity Center is located at 1510 SW Jefferson in Lee's Summit. In February of 2023, the 43,000-square-foot facility was opened. It includes an official NCAA sized gymnasium that seats 1200, locker rooms, a strength and conditioning room, a multipurpose room, a concession stand, a hospitality room, restrooms, and athletic offices.

Want to check out Summit Christian Academy firsthand?

Schedule a personalized look at our facility.

Sign up to Receive updates and event information from SCA.